Covanta Montgomery

 

OSHA VPP Star FacilityCOVANTA Montgomery, Inc.
Dickerson, Maryland
 


Click to view NEPT InformationThe Montgomery County Resource Recovery Facility began commercial operation in August 1995. The facility processes an average of 1,500 tons-per-day of solid waste, generating up to 55 megawatts of renewable energy, enough power for 40,000 homes. All waste is first delivered to the Shady Grove Transfer Station in Derwood, compacted into intermodal steel waste containers and then loaded onto railcars with gantry cranes. Each day CSX assembles the train and makes the 22-mile trip to the facility in Dickerson. There the containers are off-loaded and trucked from the on-site railyard to the facility's enclosed refuse building. Residue that remains from the process is loaded into sealed containers and shipped by rail to a landfill located in Brunswick, VA. This unique rail system allows the County to virtually eliminate truck traffic associated with the facility on the rural roads leading to the facility. 

 

Technical Data

Facility Address: 21204 Martinsburg Road
Dickerson, MD 20842
(301) 916-3031
 
Site: 34.9 acres in Dickerson, MD
 
Commercial Operation: August 7, 1995
 
Energy-from-Waste System: Three 600 ton-per-day waterwall furnaces with Martin® reverse-reciprocating grates and ash handling system
 
Boiler Design: 865 psig/830°F superheater outlet conditions
 
Air Pollution Control Equipment: Semi-dry flue gas scrubbers injecting lime, fabric filter baghouses, furnace dry lime injection, nitrogen oxide control system, mercury control system, and continuous emissions monitoring (CEM) system
 
Rated Refuse Capacity: 1,800 tons per day
 
Energy Generation at Rated Capacity: up to 63 megawatts from one condensing steam turbine generator
 
Sold to: Potomac Electric Power Company (PEPCO)
 
   